Rancho Del Mar Paving & Utility Improvements Project (TR240-0300)

GENERAL WORK DESCRIPTION: The Project consists of pavement rehabilitation by means of full depth replacement, asphalt rubber cape seal, water main replacement and reconnect, sewer cured in place lining throughout the eastern portions of the Rancho Del Mar neighborhood in the City of American Canyon. Work includes, but is not limited to, mobilization, storm water pollution prevention, traffic control, curb ramp upgrades, micro milling, dig out repairs, crack sealing, asphalt rubber cape seal, full depth replacement of asphalt along Rio Del Mar, new signage and striping including cross walks, water main replacement and reconnection to services, water main abandonment, and sewer cured in place lining. Streets include Rio Del Mar, Los Altos Drive, Cassayre Dr, Joan Drive, Carolyn Drive, Alta Loma Drive, Del Rey Court, and Flamingo Court in the City of American Canyon. This project is funded by the Napa Countywide Sales Tax Measure T, American Rescue Plan Act (ARPA) Grant, Water and Wastewater Enterprise funds.

Status

Bidding Closed

Prebid Date 11/5/24 2:30pm
Bid Date 12/4/24 2:00pm

Company & Contacts

City of American Canyon
Ron Ranada  

Location

American Canyon, CA

The Engineer’s Estimate for the project is $5,848,000