Skip to main content

Knightsbridge Way Reconstruction & Water Main Improvements

The Project consists of water replacement and pavement rehabilitation at Knightsbridge Way from Elliott Drive to Danrose Drive. The pavement rehabilitation method is asphalt grind and inlay/overlay and cold in-place recycling on Knightsbridge Way and asphalt grind and inlay on all Cul-de-Sac Streets. Work includes, but is not limited to, distribution of public notices, mobilization, traffic control, storm water pollution prevention, curb ramp upgrades, asphalt grind and inlay, cold in-place recycling, asphalt concrete base repair, adjusting utility covers to grade, reinstallation of survey monuments, signage and striping, abandonment of existing water main and water valves, installation of new water main and water valves, installation of water services and all appurtenances, hydrant improvements and all appurtenances, testing of new water installation on Knightsbridge Way in American Canyon. This project is funded by the Napa Countywide Sales Tax Measure T and State SB1/RMRA.
Download Download section as a Zip file free of charge
Filetype Icon Name Size Quick Download
952.8 KB Download
303.7 KB Download
65.7 KB Download
119.7 KB Download
17.1 MB Download
83.0 KB Download
686.0 KB Download