The project consists of the following general work pursuant to the construction of sidewalk, curb & gutter, and storm drain facilities along Melvin Road, Wilson Way, and James Road:
1. Potholing of existing utilities
2. Site clearing and demolition
3. Grading and earthwork for sidewalk / curb and gutter installation
4. Trenching and storm drain conduit installation
5. Minor utility adjustments as needed for pipe - pipe crossings
6. Pavement restoration
7. Install traffic signs, striping, traffic calming measures
8. Pavement and landscape restoration.
The Engineer’s Estimate for the project is $2,257,865.