TR22-0400 Benton Way Pavement Rehabilitation Project

GENERAL WORK DESCRIPTION The Project consists of pavement rehabilitation of approximately 2,000 linear feet of roadway by means of full depth reclamation via cement treatment (FDR-C) at Benton Way from Wetlands Edge Road to Elliott Drive. Work includes, but is not limited to, mobilization, storm water pollution prevention, traffic control, curb ramp upgrades and curb extensions, road base treatment via FDR-C, asphalt concrete paving, and new signage and striping. This project is funded by the Napa Countywide Sales Tax Measure T, State SB1/RMRA, and ARPA.
Plans (click to expand/collapse)