Green Island Road Rule 20 A/B Utility Undergrounding Project (TR16-0703)

The project consists of the following general work pursuant to the conversion of existing overhead power, telecom, fiber-optic, and cable utility lines along Green Island Road, underground into a joint trench facility: 1. Potholing of existing utilities 2. Site clearing and demolition 3. Excavation/backfill and placement of new conduit and equipment enclosures; 4. If required, pavement and landscape restoration.

Status

Bidding Closed

Bid Date11/1/22 2:00pm

Company & Contacts

City of American Canyon

Ron Ranada   rranada@cityofamericancanyon.org

Location

American Canyon, CA

The Engineer’s Estimate for the project is $1,820,000.